DAIMACivil Engineering Works
Institutional

School Classroom Block

Two-storey classroom block delivered in phases around an operating school.

Placeholder record

A sample entry showing the structure of a project page. Not a Daima project — and excluded from search indexing until it is real.

Location
Ruiru, Kiambu County
Sector
Educational institution
Status
Completed
Completed
Project overview

A two-storey classroom block built on the grounds of a school that stayed open throughout. Institutional work carries a constraint that private sites do not: children are on the other side of the hoarding, every day, and the programme has to be built around that fact rather than the other way round.

The heavier and noisier operations were planned into school holidays, and the working area was fully separated from circulation routes for the rest of the year.

Project data

Storeys
2
Classrooms
To be supplied
Gross floor area
To be supplied
Structure
Reinforced concrete frame with masonry infill
Contract duration
To be supplied
Contract type
To be supplied

Dashed slots are figures deliberately left unfilled. Nothing here is estimated or invented.

Scope of work

What was built.

  • 01Setting out within an operating school compound
  • 02Strip foundations and ground floor slab
  • 03Reinforced concrete frame and suspended first floor
  • 04Masonry walling, windows and doors
  • 05Roof structure and covering
  • 06Internal finishes, external plaster and painting
  • 07Walkways, drainage and site reinstatement
Approach

How it was built.

Carpenter fixing timber formwork on a facadePLATE 01

Site separation was designed first: a single gated access away from the school entrance, solid hoarding, and no plant movement during arrival and departure times.

Concrete pours and demolition were scheduled into holiday periods. Work that could be done quietly continued through term time.

The block was finished and cleaned room by room so that completed classrooms could be brought into use before the whole contract closed out.

Project gallery

On site.

Placeholder photography. Replace with Daima's own progress and completion record — site photographs are the single highest-value asset a contractor's website can carry.
Carpenter fixing timber formwork on a facadePLATE 02
Workers handling precast units inside a concrete framePLATE 03
Board-marked concrete wall detailPLATE 04
Institutional teaching block with a repeating window bayPLATE 05
Worker moving through tube-and-fitting scaffoldingPLATE 06
Long white building elevation against a flat skyPLATE 07
Challenges & solutions

What the site presented, and what was done about it.

Every project has two or three decisions that determined how it went. These are the ones worth writing down.
01

Challenge

An occupied school compound with pedestrian routes crossing the natural site access.

Solution

A separate gated entrance was formed and all deliveries were timetabled outside arrival and departure windows, with a banksman on every vehicle movement.

02

Challenge

A fixed academic calendar left no room for the programme to slip.

Solution

Long-lead items were ordered before work started and float was held at the end of each phase rather than at the end of the contract, where it would have been no use.

Outcome

Classrooms handed over in time for the academic term, with the school having operated without interruption throughout the works.

Start a project

Have a project like this?

Send us the drawings if you have them, or just describe the site and what you want built. We will tell you what it needs.