Site Clearance & Bulk Earthworks

Clearance, cut and fill, haul roads and formation preparation for a phased development.

Placeholder record

A sample entry showing the structure of a project page. Not a Daima project — and excluded from search indexing until it is real.

Location
Kitengela, Kajiado County
Sector
Private developer
Status
In progress
Completed
Project overview

An enabling-works package preparing a sloping plot for a phased development. The objective was to move as little material off site as possible, which meant balancing cut and fill across the plot rather than digging to a single level and carting the difference away.

Haul roads, drainage and the site entrance were built first, so that everything after them had somewhere to run on and somewhere for water to go.

Project data

Site area
To be supplied
Earthworks volume
To be supplied
Material re-used on site
To be supplied
Formation testing
Layer compaction tests
Contract duration
To be supplied
Contract type
To be supplied

Dashed slots are figures deliberately left unfilled. Nothing here is estimated or invented.

Scope of work

What was built.

  • 01Topographic survey and earthworks volume balance
  • 02Clearance of vegetation and existing structures
  • 03Bulk cut and fill, with material re-use on site
  • 04Temporary haul roads and site entrance
  • 05Formation compaction and testing
  • 06Temporary drainage and silt control
Approach

How it was built.

Tracked excavator cutting a trench on a sitePLATE 01

Volumes were calculated from the survey before plant arrived, so that the cut and fill balanced across the site and haulage off site was minimised.

Fill was placed in layers and compacted to specification, with test results recorded at each layer rather than assumed from the machine passes.

Temporary drainage and silt traps were installed before bulk excavation, not after the first heavy rain.

Project gallery

On site.

Placeholder photography. Replace with Daima's own progress and completion record — site photographs are the single highest-value asset a contractor's website can carry.
Tracked excavator cutting a trench on a sitePLATE 02
Wheel loader working a stockpile of aggregatePLATE 03
Aerial view of an active construction site with plant and materialsPLATE 04
Surveyor setting out with a total stationPLATE 05
Bulldozer working ground under a heavy skyPLATE 06
Pipeline trench and excavator at duskPLATE 07
Challenges & solutions

What the site presented, and what was done about it.

Every project has two or three decisions that determined how it went. These are the ones worth writing down.
01

Challenge

A significant level difference across the plot with limited budget for material haulage.

Solution

Cut and fill volumes were balanced from the survey so that excavated material was re-used on site, which removed most of the haulage and the tipping cost with it.

02

Challenge

Heavy seasonal rain risked washing loose material onto the neighbouring road.

Solution

Cut-off drains and silt traps were installed ahead of bulk excavation, and exposed faces were left no larger than could be dealt with in a single wet spell.

Outcome

A prepared and tested formation ready for the first construction phase, with earthworks balanced on site.