Project overview

A single-span warehouse with an attached office block, built on a flat industrial plot. The defining element of a building like this is the floor: it takes racking loads and forklift traffic for decades, and it is the one thing that cannot be repaired without stopping the operation.

The yard was designed and built alongside the building, because articulated vehicle movements dictate the geometry of everything outside the wall line.

Project data

Floor area
To be supplied
Clear height
To be supplied
Structure
Steel portal frame on pad foundations
Floor slab
Ground-bearing, power-floated
Contract duration
To be supplied
Contract type
To be supplied

Dashed slots are figures deliberately left unfilled. Nothing here is estimated or invented.

Scope of work

What was built.

  • 01Bulk earthworks, formation preparation and compaction
  • 02Heavy-duty ground-bearing floor slab
  • 03Pad foundations and holding-down bolt setting
  • 04Portal frame erection and cladding interface
  • 05Attached office block and amenity areas
  • 06Yard hardstanding, drainage and vehicle circulation
Approach

How it was built.

Completed warehouse interior with a power-floated floorPLATE 01

The formation was compacted and tested before any slab work, because a floor slab reproduces whatever is underneath it.

Holding-down bolts were set from a steel template surveyed into position rather than measured off the shuttering, which is the difference between a frame that lands and a frame that has to be packed.

The floor was poured in bays sized around the joint layout, then cured under cover to control early shrinkage cracking.

Project gallery

On site.

Placeholder photography. Replace with Daima's own progress and completion record — site photographs are the single highest-value asset a contractor's website can carry.
Completed warehouse interior with a power-floated floorPLATE 02
Steel frame members photographed from belowPLATE 03
Wheel loader working a stockpile of aggregatePLATE 04
Long white building elevation against a flat skyPLATE 05
Completed warehouse interior with a power-floated floorPLATE 06
Bulldozer working ground under a heavy skyPLATE 07
Challenges & solutions

What the site presented, and what was done about it.

Every project has two or three decisions that determined how it went. These are the ones worth writing down.
01

Challenge

Floor flatness and joint positions had to suit racking and forklift routes that were not finalised at the start.

Solution

Joint layout was agreed with the operator before the pour sequence was fixed, and the slab was specified to the more demanding of the two possible racking layouts.

02

Challenge

Surface water across a large impermeable yard area.

Solution

Falls and gully positions were set out from the survey and checked with a level before the sub-base was sealed, rather than corrected afterwards with patching.

Outcome

A warehouse handed over with a tested floor slab, a yard that drains, and a frame erected without packing or remedial work.

Start a project

Have a project like this?

Send us the drawings if you have them, or just describe the site and what you want built. We will tell you what it needs.